Encrypted login | home

Program Information

IMRT Plan Recalculation in Patient Based On Dynalog Data and the Effect of a Single Failing MLC Motor


M Morcos

M Morcos1*, E Mitrou2, (1) Vantage Oncology, San Bernardino, CA, (2) Centre Hospitalier de l'Universite de Montreal, Montreal, QC

Presentations

SU-E-T-479 (Sunday, July 12, 2015) 3:00 PM - 6:00 PM Room: Exhibit Hall


Purpose: Using Linac dynamic logs (Dynalogs) we evaluate the impact of a single failing MLC motor on the deliverability of an IMRT plan by assessing the recalculated dose volume histograms (DVHs) taking the delivered MLC positions and beam hold-offs into consideration.

Methods: This is a retrospective study based on a deteriorating MLC motor (leaf 36B) which was observed to be failing via Dynalog analysis. To investigate further, Eclipse-importable MLC files were generated from Dynalogs to recalculate the actual delivered dose and to assess the clinical impact through DVHs. All deliveries were performed on a Varian 21EX linear accelerator equipped with Millennium-120 MLC. The analysis of Dynalog files and subsequent conversion to Eclipse-importable MLC files were all performed by in-house programming in Python. Effects on plan DVH are presented in the following section on a particular brain-IMRT plan which was delivered with a failing MLC motor which was then replaced.

Results: Global max dose increased by 13.5%, max dose to the brainstem PRV increased by 8.2%, max dose to the optic chiasm increased by 7.6%, max dose to optic nerve increased by 8.8% and the mean dose to the PTV increased by 7.9% when comparing the original plan to the fraction with the failing MLC motor. The reason the dose increased was due to the failure being on the B-bank which is the lagging side on a sliding window delivery, therefore any failures on this side will cause an over-irradiation as the B-bank leaves struggles to keep the window from growing.

Conclusion: Our findings suggest that a single failing MLC motor may jeopardize the entire delivery. This may be due to the bad MLC motor drawing too much current causing all MLCs on the same bank to underperform. This hypothesis will be investigated in a future study.


Contact Email: